THE PROJECT

Project Highlights
  • 320,000 SF school campus
  • New performing arts center and multiple sports facilities
  • Designed to meet the growing demand of the student population

Arizona College Prep High School includes 320,000 square feet of new infrastructure that provides students and faculty with a full-service campus and advanced opportunities. Seven buildings and seven sports spaces include classrooms, administrative offices, cafeteria, bookstore, a performing arts center, an athletics building that includes a main and auxiliary gymnasium, and home and away concession buildings.

OUR IMPACT

MULTIPLE PACKAGES

to accommodate construction schedule

ACCELERATED

design schedule

INCREASED OPPORTUNITIES

for 1,200+ students
Service Provided
  • Structural engineering

OUR SOLUTIONS

Structural systems include masonry bearing walls and interior structural steel framing. The roof areas are framed with steel roof deck over steel joists and wide flange steel beam girders. The second floor framing of Buildings B, C, & D is composed of concrete over steel deck, supported by steel joists and wide flange steel beam girders. All steel columns consist of rectangular and square hollow structural sections. Foundations are conventional spread footings below steel columns and continuous footings below masonry walls bearing on compacted engineered fill. In order to mitigate cracking at exposed polished ground concrete floor systems, our team provided additional coordination with slab on grade and the 2nd floor system.

Location:

Chandler, AZ

Completed:

2021

Construction Cost:

$87,000,000

Owner:

Chandler Unified School District

Architect:

Cole Architects

Contractor:

Core Construction